By File Name By Size By Time Modified
Bid Opening List.doc
64 KB 8:48:37 AM 07-02-2015
IN024 VanNuys Medical Science Building - Remodel Restrooms A510, A512, B31 - 20141214.docx
15.2 KB 11:40:20 AM 06-30-2015
IN088 University Library Suite 2102 - Remodel - 20151236.docx
18.4 KB 10:56:27 AM 06-29-2015
BL000A Site - Miscellaneous Street Repairs 2015 - 20151327.docx
18.7 KB 10:55:19 AM 06-29-2015
IN072 Engineering Science & Technology Building - Add Make-up Air and Exhaust Air Capacity - 20141197.docx
20.3 KB 10:54:47 AM 06-29-2015
IN023 School of Nursing - AHU 4 Replacement - 20141217.docx
20.2 KB 10:54:11 AM 06-29-2015
IN345 Biotechnology Research & Training Center - Add Exhaust Fan to EF-6 & EF-7 System - 20141191.docx
20.1 KB 10:53:41 AM 06-29-2015
IN033A Gatch Hall - New East Entry - 20139559.docx
19 KB 10:53:07 AM 06-29-2015
CO486 Columbus Building - Replace Existing Boiler System. - IUPUC - 20142320.docx
19.6 KB 10:51:19 AM 06-29-2015
20128034 - BL607S IU Golf Teaching and Training Center.docx
18.5 KB 2:02:24 PM 06-26-2015
BL000A Site - Implement CW Demand Flow Optimization Program - 20139129.docx
15.4 KB 11:54:26 AM 06-17-2015
IN088 University Library - Entrance Paver Replacement - 20142198.docx
15.8 KB 11:54:26 AM 06-17-2015
NW833 Chiller Plant - Chiller Replacement - 20131009.docx
18.5 KB 9:18:38 AM 06-02-2015
20140804 - IN026 University Hospital Garage - Upgrade Lighting System.docx
21.7 KB 9:15:13 AM 05-29-2015
20140809 - IN000A Site - Parking Lot 83 - Resurfacing and Repair.docx
18.1 KB 9:10:05 AM 05-29-2015
20140794 - IN115 Sports Garage - Replace Lighting System.docx
21.5 KB 9:03:32 AM 05-29-2015
IN000A Site - Parking Lot 83 - Resurfacing and Repair - 20140809.docx
15.3 KB 4:10:09 PM 05-27-2015
IN115 Sports Garage - Replace Lighting System - 20140794.docx
17.9 KB 4:10:08 PM 05-27-2015
IN026 University Hospital Garage - Upgrade Lighting System - 20140804.docx
17.9 KB 4:10:08 PM 05-27-2015
IN001P 1200 Waterway - Roof Replacement and Wall Repairs - 20141230.docx
18.3 KB 1:33:40 PM 05-26-2015
20142264 - BL209 Wells Library - Cyber Cafe Renovation.docx
18.6 KB 1:31:35 PM 05-26-2015
IN028 Ball Residence Hall - Install New Fire Alarm System - 20151150.docx
20 KB 1:30:50 PM 05-26-2015
SE883 Hillside Hall - New Pedestrian Bridge - 20140270.docx
18.6 KB 7:37:50 AM 05-15-2015
BL000B Multi-Building - Replace Underground Hot Water Distribution Piping - 20151050.docx
18.6 KB 11:05:01 AM 05-14-2015
20142395 - BL027 Swain West Room 055 Renovation.docx
19.8 KB 10:22:17 AM 05-12-2015
NW831 Arts & Sciences Building - New Construction- 20139339.docx
15.7 KB 11:47:07 AM 05-08-2015
SB850 Northside Hall - Replace Cooling Tower - 20151098.docx
15.9 KB 7:04:49 PM 05-06-2015
BL011 Mathers Museum - Roof Replacement - 20141290.docx
15.8 KB 11:53:19 AM 05-05-2015
20141177 - SB862 University Center Basement - Restroom Renovation for ADA.docx
17.9 KB 11:38:00 AM 05-01-2015
20141346-BSD100 Rec Sports-Multi-Purpose Field-Synthetic Turf Installation.doc
36 KB 9:53:46 AM 04-28-2015
20151019 - IN064 Dental School 4th Floor South Section Remodel.docx
20.4 KB 11:24:50 AM 04-27-2015
20141903 - BL452 SPEA - Renovate Atrium Restrooms.docx
18.1 KB 11:16:17 AM 04-27-2015
Read Hall Residential Tower Renovation - IUB - 20140290.docx
20.5 KB 9:05:32 AM 04-23-2015
IN102 Education Social Work – Flooring Replacement - IUPUI - 20141193.docx
17.8 KB 11:21:08 AM 04-13-2015
BL209 Wells Library University Graduate School Office Buildout- IUB - 20140594.docx
18.1 KB 1:49:50 PM 04-07-2015
IN114 Natatorium - Add Second Level to Auxiliary Gym - IUPUI - 20141692.docx
18.5 KB 2:59:01 PM 04-02-2015
Science Building Roof Replacement - IUPUI - 20141219.docx
19.2 KB 2:13:19 PM 03-30-2015
Long Hall Roof Replacement - IUPUI - 20141212.docx
18.7 KB 2:01:30 PM 03-30-2015
Former Wishard Hospital Buildings - Asbestos Abatement and Demolition - IUB - 20140077.docx
16.7 KB 12:52:13 PM 03-23-2015
BL401 Hillcrest Apartments Renovate Psychology Lab back into Housing - IUB - 20140980.docx
18 KB 1:59:54 PM 03-18-2015
IN114 Natatorium Renovation - Bid Package 2 - All Interior - IUPUI - 20141442.docx
18.3 KB 1:57:32 PM 03-18-2015
BL452 SPEA Roof Repair Phase 2 - IUB - 20128301.docx
20.5 KB 9:33:54 AM 03-16-2015
IN202 Health Information & Translational Sciences Building - Upgrade Perimeter Heating - IUPUI - 20141203.docx
15.4 KB 11:22:53 AM 03-13-2015
BL409 University Press Warehouse - Convert to Studio Space - IUB - 20141595.docx
18.7 KB 9:03:58 AM 03-12-2015
IN033A Gatch Hall - Connector Repairs, Windows and Interior - 20141200.docx
17.1 KB 3:09:05 PM 03-11-2015
SE886 Service Building - HVAC System Renovations- IUS - 20140942.docx
19.7 KB 8:27:09 AM 02-27-2015
IN039 Cancer Research - Replace Cooling Coils and Drain Pans, AHU-1, IUPUI - 20141192.docx
19.7 KB 8:47:10 AM 02-20-2015
IN015 Walther Hall - Replace Humidifiers, Install Reverse Osmosis System - IUPU I- 20139511.docx
21.8 KB 10:56:41 AM 02-18-2015
SE886 Service Building HVAC Renovations - IUS - 20140942.docx
19.7 KB 3:43:33 PM 02-11-2015
SB849 Schurz Library - Chilled Water Extension & HVAC Improvements - IUSB - 20141179.docx
18.6 KB 1:55:24 PM 02-10-2015
NW000A Site - New Parking Lot Near Sycamore Hall - 20131741.docx
18.8 KB 9:30:31 AM 12-04-2014
Student Events and Activity Center - IUE - 20106447.docx
19.7 KB 9:37:07 AM 11-11-2014
BL027 Swain West - IDF Upgrades - 20139347.docx
19.4 KB 11:38:07 AM 10-30-2014
Hawthorn Hall - Renovate Two Elevators - IUN - 20117009.doc
35 KB 3:06:11 PM 09-17-2014
Research II - Repl Humidifiers & Install Reverse Osmosis System - IUPUI - 20139512.docx
21.5 KB 1:57:32 PM 05-27-2014
20131192 - Merrill Hall Install ADA Walkway - IUB.docx
17.7 KB 1:20:54 PM 05-27-2014
Eng Sci Technology Bldg - Roof Repl - IUPUI - 20139526.doc
35 KB 10:30:58 AM 04-14-2014
Springwood Hall Collaborative Classroom 203-207-211 - IUE - 20117700.pdf
8.5 KB 8:10:13 AM 03-27-2014
Site Parking Lot Upgrade - IUK - 20139120.docx
17.6 KB 3:46:11 PM 03-12-2014
Student Recreational Sports Center - Roof Replacement - IUB - 20128822.docx
18.1 KB 9:19:53 AM 01-28-2014
Development of a Multi-Instiutional Academic Health Science and Research Center, Evansville, IN, 20131788.docx
14.7 KB 7:52:48 AM 12-11-2013
Business-SPEA Building - Room 2010 - Renovation - IUPUI - 20128787.docx
17.5 KB 9:40:27 AM 10-30-2013
Wells Library Cafe Relocation - IUB - 20128857.docx
15.8 KB 6:28:46 PM 05-15-2013
RFQ Public Notice for CW Production and Distribution Automation - IUB - 20139129.docx
15.2 KB 9:42:16 AM 05-07-2013
Student Recreational Sports Center Roof Replacement - IUB - 20128822.docx
17.6 KB 8:35:30 AM 04-18-2013
Eskenazi Fine Arts Center - Provide Cooling in Various Rooms - IUPUI - 20128471.doc
36.5 KB 10:27:51 AM 03-14-2013